Extension

 

Date of this Version

2003

Abstract

Extension Circular 03-821: This circular talks about drilling and developing wells, well development costs, pumps for lifting water and their costs, moving water with underground pipe, tanks and their costs, and cost estimation sheets.

Share

COinS