U.S. Department of Defense
Date of this Version
1986
Abstract
This report is to document the procedures used and the results obtained fram the bank erosion study for the Missouri National Recreational River Gavins Point Dam to Ponca, Nebraska. The period studied extends fram 21 April, 1978 to 10 August, 1985 or a period of 7.31 years. The study was made for the Omaha District of the U. S. Army Corps of Engineers by River Pro's under Contract No. DACW45-85-D-0084.
Comments
Prepared For U.S. Army Corps of Engineers, Onaha District. Prepared By
RIVER PRO'S (1986) 1-60