"Missouri River Stream bank Erosion Assessment Gavins Point Dam to Ponc"

U.S. Department of Defense

 

Authors

Date of this Version

1999

Comments

Published by the U.S. Army Corps of Engineers, Contract No. DACW45-97-D-0007, Delivery Order 0019 (1999) 1-58

Abstract

The purpose of this report is to document the methodology and results obtained from a study of bank erosion along the Missouri River between Gavins Point Dam (RM 805.2) and Ponca, Nebraska (RM 752.3). Three (3) periods were studied: 1) August 1985 to August 1995, a time span of 10 years and; 2) from August 1995 and August 1997, a time span of 2 years. This study has been prepared by HDR Engineering, Inc. (HDR) under Contract No. DACW 45-97-D-0007 (Delivery Order 0019) for the Omaha District of the U.S. Army Corps of Engineers.