Libraries at University of Nebraska-Lincoln

 

Document Type

Thesis

Date of this Version

1967

Citation

Thesis (M.S.)—University of Nebraska—Lincoln, 1967. Department of Agricultural Engineering.

Comments

Copyright 1967, the author. Used by permission.

Abstract

The objective of this study was to develop a means for effectively scheduling the operation of a balewagon subsequent to the baling operation.To obtain this objective, hypothetical baler-balewagon operating relationships were considered and a mathematical model describing these relationships was formulated.Man-machine performances were used as building blocks for the mathematical model.

Advisor: R. W. Kleis

Share

COinS