Industrial and Management Systems Engineering

 

Date of this Version

10-1998

Comments

Presentation: “Using Simulation to Derive Activity-Based Costing Estimates,” Presentation at 1998 INFORMS Conference, Oct 1998 (Seattle, WA).

Abstract

This presentation showcases integrating activity based costing into the development of a SIMAN simulation of a manufacturing system.

Share

COinS