Morcous, G., Maguire, M., Tawadrous, R. (2019.) "Evaluation of Reducing Cement Content in NDOR Class R Combined Aggregate Gradations". NDOT Research Report SPR-P1(18) M069.

Abstract

The Kearney East Bypass bridge is the first project that implements the newly developed precast concrete deck system (known as 2nd generation NUDECK). The new system consists of full-depth full-width precast prestressed concrete deck panels that are 12 ft (3.66 m) long each. The panels have covered shear pockets at 4 ft (1.22 m) spacing on each girder line to host clustered shear connectors that are adjustable in height. Narrow unreinforced transverse joints are used to eliminate the need for deck overlay. Also, deck panels are post-tensioned in the longitudinal direction using a new post-tensioning system that eliminates the need for post- tensioning ducts, strand threading, and grouting operations.

The project has twin bridges: a southbound bridge with cast-in-place (CIP) concrete deck, and northbound bridge with the new precast concrete (PC) deck system. The two bridges were completed in the fall of 2015 and opened to traffic in the fall of 2016. Due to the unique features of the new PC deck system, this research project was initiated to monitor short-term performance using live load test and long-term performance under traffic loads to evaluate the system performance. Both CIP concrete deck and PC deck bridges were instrumented and tested during the summer of 2016 to compare the performance of their superstructures. Also, finite element analysis (FEA) was conducted to predict the performance of the new PC deck system. The results of both analytical and experimental investigations indicated that the PC deck system performs as predicted and very comparable to the conventional CIP concrete deck.

Share

COinS